Construction of a swimming pond is done in stages. Swimming pool contractors Georgia follow well predetermined processes while constructing a pond. The processes have been used many times and given excellent results. Failure to follow this sequence could produce poor results that would make the owners very disappointed.
There are several steps that need to be followed during swimming pond construction. This sequence maintains order and ensures that the work done is acceptable and of good quality. Skipping some of the steps could lead to problems with law maintainers or even the owners of the pool. Swimming pool contractors Georgia always follow the right process.
The design of the project to be done is the first thing to work on. It may require the services of an expert. The other option is to use a design that has been implemented elsewhere. The owners are supposed to give an input in form of ideas. The ideas assist the designer to come up with something which reflects the thoughts of the owners.
Different places are governed by laws and guidelines. These are meant to ensure the safety of the citizens as well as maintaining order. Any laws that govern the construction industry must be adhered to. Permission to go ahead with the construction plans should be obtained from the relevant offices. This procedure could take long due to the many requests made for permits.
The actual site for construction is marked out to show the shape and site of the pond. This acts as a good guide for the workers especially when removing soil from the ground. Digging to create a hole which resembles the final pond starts after the marking is completed. The machines to be used in digging should not be too large. Smaller ones can cut out more accurate corners and are more easily moved around structures that should not be damaged in the compound.
Steel is a strong construction material. In pool construction, it is used in bar form. They are joined together at right angles to each other to form a net like skeleton. This is done on the floor and walls of the pond. They enhance the durability of the construction. Before concrete is poured, a plumber fixes the pipes.
Concrete is poured to fill the floor and walls of this new structure. This covers the metallic skeleton which had been assembled earlier. The bottom is the thickest of all the concrete walls and thus the strongest too. The strength to resist failure upon being compressed is increased by use of pressure when pouring the mixture into the hole which has just been dug.
When the concrete is ready, tiles can be put in place. The tiles used are selected by the owners. They could be big or small and also of different shapes and colors. Some times a designer can help to narrow down the options for the owners so that it is less confusing for them to make a choice.
A plumber installs the water systems and any extra pipes that are necessary. He also fixes the filters to clean the water. Water heaters are put in place and checked if they are functioning well.
The platforms adjacent to the pond are also decorated. They should be in harmony with the pool's design so as to give it a beautiful blend. The deck should also blend in with the house. Any debris which has resulted from the construction work is collected and disposed off properly. The owners are instructed on how to care for the pond and officially handed the pool.