Materials Needed:
- Tetherball pole
- Quick-drying concrete mix
- Gravel or crushed rock
- Shovel
- Water
- Level
- Measuring tape
- Safety goggles
- Gloves
Instructions:
1. Choose the Location:
- Select a suitable location for the tetherball pole, ideally on a level surface with good drainage.
- Ensure that the area is clear of any underground utilities or obstacles.
2. Dig the Hole:
- Dig a hole approximately 2 feet deep and 8 inches wide.
- The hole should be deep enough to allow for at least 1 foot of concrete beneath the pole.
3. Set the Pole:
- Place the tetherball pole in the center of the hole, ensuring it stands upright and level.
- Use a level to check the vertical alignment of the pole.
4. Add Gravel or Crushed Rock:
- Pour a layer of gravel or crushed rock about 6 inches deep into the bottom of the hole.
- This will provide drainage and help stabilize the pole.
5. Mix the Concrete:
- Prepare the quick-drying concrete mix according to the manufacturer's instructions.
6. Pour the Concrete:
- Carefully pour the concrete mix into the hole, ensuring that it surrounds the pole and fills the gaps between the pole and the gravel.
- Use a shovel to spread and level the concrete.
7. Level the Concrete:
- Check the level of the concrete and adjust the pole as needed to ensure it remains vertical.
8. Allow the Concrete to Set:
- Let the concrete set and cure completely, as per the recommended curing time specified by the concrete mix manufacturer.
9. Backfill the Hole:
- Once the concrete has set, backfill the remaining space around the pole with soil or sod to create a smooth and level surface.
By following these steps, you can securely concrete a tetherball pole into the ground, providing a stable and enjoyable playing experience. Remember to wear appropriate safety gear and work cautiously when handling concrete.
NBA Predictions: Hawks Fans Expect Horford to Stay Healthy
How To Make Homemade Carp Fishing Boilies For Winter And Summer!
Copyright © www.mycheapnfljerseys.com Outdoor sports All Rights Reserved