How many yards of gravel do you need to cover a x area?

The amount of gravel needed to cover a given area depends on the depth to which you want the gravel to cover the surface, as well as the size of the gravel pieces. It is usually measured in cubic yards. To determine the amount of gravel you will need, follow these steps:

Step 1: Determine the Area

Measure the length and width of the area you want to cover with gravel in feet. Multiply the length and width to find the area in square feet.

For example, if the area is 10 feet long and 15 feet wide, the area would be 150 square feet (10 ft x 15 ft = 150 sq. ft.).

Step 2: Determine the Depth

How thick do you want the gravel layer to be? This will determine how much gravel you need. Common gravel layer thicknesses range from 2 inches to 6 inches, but you can adjust this based on your preference.

For example, if you want the gravel to be 4 inches thick, you would use 4 inches (0.33 feet) as the depth.

Step 3: Calculate the Volume

To find the volume of gravel needed, multiply the area by the depth in feet. This will give you the volume in cubic feet.

For our example, with an area of 150 sq. ft. and a depth of 0.33 ft., the volume of gravel required is 49.5 cubic feet (150 sq. ft. x 0.33 ft. = 49.5 cu. ft.).

Step 4: Convert to Cubic Yards

Since gravel is typically sold in cubic yards, you need to convert the volume from cubic feet to cubic yards. There are 27 cubic feet in one cubic yard.

Divide the volume in cubic feet by 27 to find the volume in cubic yards.

In our example, 49.5 cubic feet divided by 27 gives us approximately 1.8 cubic yards of gravel (49.5 cu. ft. / 27 = 1.83 cu. yd.).

Step 5: Add Extra for Overage

It's always a good practice to add a little extra to your calculation to account for any spillage, waste, or compaction.

A 5-10% overage is typically sufficient.

For our example, adding 10% would bring the total to approximately 2.0 cubic yards of gravel (1.83 cu. yd. + 10% = 2.013 cu. yd.).

Therefore, you would need approximately 2 cubic yards of gravel to cover a 150-square-foot area with a 4-inch depth of gravel, accounting for a 10% overage.